The High Velocity Hurricane Zone (HVHZ) includes Miami-Dade County and Broward County. This zone has the most stringent building code requirements in the United States for wind resistance, established after Hurricane Andrew in 1992.
| Requirement | HVHZ | Rest of Florida |
|---|---|---|
| Product Approval | Miami-Dade NOA required | FL Product Approval accepted |
| Impact Testing | Large missile (9 lb 2x4 at 50 fps) | Large missile in WBDR, small missile elsewhere |
| Design Wind Speeds | 170-185+ mph | 130-175 mph (varies) |
| Inspections | More rigorous, NOA verified on-site | Standard FL building inspection |
Professional, print-ready wind load calculation reports for Florida building permits. $19.99 per project.
Start Your Calculation